Project Spotlight: The CORE Building at CSUEB
We always enjoy delivering spectacular projects to our clients, and the new CORE Building on the Hayward campus of California State University East Bay (CSUEB) is certainly no exception. Work is nearly complete on this state-of-the-art, $85 million, 100,000 square feet, LEED Gold structure, which will serve as the new heart of the campus.
The CORE Building will replace and expand upon the functions of CSUEB’s original library while adding new collaborative spaces that connect the upper and lower sections of campus. Here’s what can be found on the building’s three levels:
- Ground floor: Collaboration zones and innovation labs, including the Hub for Entrepreneurship
- Second floor: A modern new library that helps students research and navigate the information age economy; study spaces inside and on the exterior roof deck
- Third floor: The peer-led Student Center for Academic Achievement (SCAA); an enclosed lounge space; study carrels; a meditation area
We’re proud to have helped bring the CORE to life, given the very special relationship between VPCS and the CSU system. Back when we were just getting started 25 years ago, they gave us a chance to show what we were capable of by hiring us for our first major contract. Since then, we’ve delivered more than 60 major capital projects for CSU, managing work at six of the system’s 23 campuses. On the Hayward campus alone, we’ve worked on numerous projects since 2006.
“The experience VPCS brings by having done so much work for the CSU system is really valuable, since CSU has its own processes and procedures when it comes to capital projects,” says Quan Lee, our senior project manager on the CORE Building site. “CSU keeps coming back to VPCS because of that experience. VPCS just has such a good understanding of the CSU process and how projects of any size should be managed on behalf of this client, which helps things go smoothly.”
We fully expected to construct the CORE Building while university activities were in full swing, adapting to the needs of students and faculty – and, most importantly, staying out of their way. In fact, we’re known for our ability to keep a low profile on an occupied campus. But the timing of this project lightened that load somewhat, as we broke ground in early 2020, just two months before the pandemic closed the campus. So construction continued on a mostly empty site until classes resumed in the fall of 2021, at which point we adjusted back to our routine of working on a busy campus. A dedication celebration was held last month, and we expect to wrap up our work on the project soon.
When it comes to the impact this project will have, Quan sums it up nicely: “Partly because of its size and also because it sits right in the center of campus, the CORE Building is going to be the new focal point of CSUEB. It’s going to help make this a very dynamic university campus.”
Check out a fly-through animation of the CORE Building here and a timelapse video of the project’s construction by clicking on the “Time-Lapses” button here.
June 27, 2022