BUSD > Berkeley High School Turf Replacement Project

The scope of the project included removing the existing synthetic turf product and installing a new one in its place. In addition, the contractor installed a new drain/shock pad beneath the turf, as well as make the necessary base adjustment along the field perimeter to accommodate the shock pad thickness. Added work included painting of existing football goalposts and other site work associated with the turf installation.

Owner: Berkeley Unified School District

Construction Cost: $734,255

Architect: Verde Design Inc.

Contractor: Valley Precision Grading, Inc.